BORONÓW-TRZEBINIA CONSTRUCTION

Project name:

„Construction of the Boronów – Trzebinia petroleum products pipeline along with infrastructure necessary for its operation".
Investment implemented by consortium of companies: Przedsiębiorstwo "AGAT" S.A. and ZRUG sp. z o.o. 

Inwestor: PERN S.A.

Scope of work:

  • Preparatory works.
  • Comprehensive construction of a product pipeline approximately 97 km in length.
  • Execution of over 100 trenchless crossings under existing infrastructure, i.e., microtunnels, drilling, HDD.
  • Construction of linear facilities - LSZ and LDS.
  • Construction of complete cathodic protection installation.
  • Pressure testing.
  • Pipeline commissioning.

LATEST NEWS

Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...