Operating continuously since 1973

Reconstruction of gas pipeline in Kruszwica

client: STRABAG Sp. z o.o. Dyrekcja PC, Oddział EE Toruń
Completion date: 07.10.2016 – 31.11.2016

Reconstruction of high-pressure gas pipeline 88.9x5.0mm MOP 5.5 MPa in Kruszwica as part of traffic safety improvement on DK62 in Kobylniki i.e. construction of roundabout at the intersection of national road No. 62 and provincial road No. 412.

LATEST PROJECTS

Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...