Operating continuously since 1973

Sewage system for Puszcza Zielonka Landscape Park area and surroundings

client: Związek Międzygminny „Puszcza Zielonka"
Completion date: 06.08.2014 – 25.07.2016

Sewage system for Puszcza Zielonka Landscape Park area and surroundings - Contract X - Central Wastewater Treatment Plant catchment area in Koziegłowy Task 3 - Pobiedziska Municipality - Networks and connections - Part II; sanitary sewage network with connections Ф 75-400.

Total pipeline length: 20,8 km

LATEST PROJECTS

Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...