Construction of high-pressure gas pipeline DN 300/250 6.3 MPa from Bytów to Słupsk with the following scope:
- DN 300 gas pipeline with length of 62,827 linear meters.
- DN 250 gas pipeline with length of 15,603 linear meters.
- First stage reduction and metering station Q = 20,000 m3/h in Redzikowo.
- DN 300 pig launcher in Mądrzechowo.
- DN 250 pig launcher in Widzino.
- DN 300 pig receiver in Reblino - inline block valve stations in Borzytuchom and Suchora locations.