BORONÓW-TRZEBINIA CONSTRUCTION

client: PERN S.A.
Construction of the Boronów – Trzebinia petroleum products pipeline along with infrastructure necessary for its operation

Scope of work:

  • Preparatory works.
  • Comprehensive construction of a product pipeline approximately 97 km in length.
  • Execution of over 100 trenchless crossings under existing infrastructure, i.e., microtunnels, drilling, HDD.
  • Construction of linear facilities - LSZ and LDS.
  • Construction of complete cathodic protection installation.
  • Pressure testing.
  • Pipeline commissioning.

LATEST PROJECTS

Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Construction of a 38.6 km high-pressure gas pipeline with MOP 8.4 MPa, diameter 700mm along with technological facilities...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...