Project name:

Construction of water main and network in Kórnik 

General Contractor: Consortium of companies: TERLAN Sp. z o.o. (Consortium Leader) and WUPRINŻ S.A. (Consortium Partner)

Scope of work:

  • Preparatory works.
  • Comprehensive construction of water network with total length of approx. 15,666.8m, including: 
  • Construction of water main DN 500 with length of approx. 12,954.80 m (stage Ia) on section from eastern main to border of Mosina and Kórnik municipalities in Mieczewo including vegetation removal and surface restoration
  • Construction of water main DN 400 with length of approx. 2,712.00 m (stage Ib) along provincial road No. 431 and 434, from border of Mosina and Kórnik municipalities in Mieczewo to Mościennicka Street in Kórnik including vegetation removal and surface restoration
  • Execution of 47 trenchless crossings under existing infrastructure i.e. directional drilling with GRP DN600 and DN750 casing pipes.
  • Pressure testing.

LATEST NEWS

Budowa Gazociągu Racibórz-Oświęcim
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...