Operating continuously since 1973

AREA

OF ACTIVITY

Our core business is the design, supervision and construction of the following facilities:

  • Industrial construction
  • General construction,
  • Auxiliary infrastructure,
  • Landmarks,
  • Design and build.

SEWAGE NETWORKS

  • gravity systems,
  • pressure systems,
  • vacuum systems made of materials according to Client's requirements (stoneware, PVC, PE, GRP, Concrete/Reinforced concrete),
  • technological facilities: stoneware pipe drilling.

  • gravity systems,
  • pressure systems,
  • vacuum systems made of materials according to Client's requirements (stoneware, PVC, PE, GRP, Concrete/Reinforced concrete),
  • technological facilities: stoneware pipe drilling.

WATER SUPPLY NETWORKS

  • PE pipes,
  • PVC,
  • ductile iron,
  • welded steel pipes,
  • network nodes.

  • PE pipes,
  • PVC,
  • ductile iron,
  • welded steel pipes,
  • network nodes.

WE ALSO CARRY OUT CUSTOM ORDERS

Our specialists will be happy to advise you on the services offered by our company and will select the most favourable conditions of cooperation

NEWS

CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...