Operating continuously since 1973

AREA

OF ACTIVITY

Our core business is the design, supervision and construction of the following facilities:

  • Industrial construction
  • General construction,
  • Auxiliary infrastructure,
  • Landmarks,
  • Design and build.

INDUSTRIAL PIPELINES

  • High-pressure steel transmission pipelines up to MOP = 8.4 MPa - no diameter limitation,
  • Medium high pressure steel and PE pipe distribution pipelines up to MOP = 1.6 MPa,
  • Medium and low pressure distribution pipelines made of PE pipes,
  • Steel pipelines for the transport of: crude oil, liquid fuels, water and corrosive or flammable liquids - no diameter limitation,
  • Pre-insulated steel pipelines for the transfer of heavy fuel oil,
  • Mine pipelines for the transport of formation fluids at pressures as required by the customer (e.g. 350 bar).

  • High-pressure steel transmission pipelines up to MOP = 8.4 MPa - no diameter limitation,
  • Medium high pressure steel and PE pipe distribution pipelines up to MOP = 1.6 MPa,
  • Medium and low pressure distribution pipelines made of PE pipes,
  • Steel pipelines for the transport of: crude oil, liquid fuels, water and corrosive or flammable liquids - no diameter limitation,
  • Pre-insulated steel pipelines for the transfer of heavy fuel oil,
  • Mine pipelines for the transport of formation fluids at pressures as required by the customer (e.g. 350 bar).

TECHNOLOGICAL FACILITIES ON PIPELINES

  • 1st stage and 2nd stage gas reduction and metering stations,
  • Barrage units, distribution and connection gas hubs,
  • Diagnostic piston send/receive chamber systems,
  • Process systems at gas compressor stations,
  • Gate valves chambers, switching chambers (on fuel pipelines),
  • Fuel/oil pumping stations.

  • 1st stage and 2nd stage gas reduction and metering stations,
  • Barrage units, distribution and connection gas hubs,
  • Diagnostic piston send/receive chamber systems,
  • Process systems at gas compressor stations,
  • Gate valves chambers, switching chambers (on fuel pipelines),
  • Fuel/oil pumping stations.

NATURAL GAS MINE

Comprehensive execution on a surface gas and/or oil mine installation including:

- head reinforcement on the well,

- the construction of a technological installation for the adjustment of extracted minerals to commercial parameters,

- the necessary facilities (buildings, containers, roads, fencing), power supply, control, monitoring and process safety systems, commissioning and initial operation.

Comprehensive execution on a surface gas and/or oil mine installation including:

- head reinforcement on the well,

- the construction of a technological installation for the adjustment of extracted minerals to commercial parameters,

- the necessary facilities (buildings, containers, roads, fencing), power supply, control, monitoring and process safety systems, commissioning and initial operation.

WE ALSO CARRY OUT CUSTOM ORDERS

Our specialists will be happy to advise you on the services offered by our company and will select the most favourable conditions of cooperation

NEWS

CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
Construction of DN300/250 gas pipeline from SN Kłodawa to SN...
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...
CONSTRUCTION OF GAS PIPELINE DN700 FROM RACIBÓRZ TO OŚWIĘCIM
Budowa 38.7 km gazociągu wysokiego ciśnienia MOP 8.4 MPa, średnicy 700mm wraz obiektami technolo...
CONSTRUCTION OF BOROWO-5, GRANÓWKO-1 AND SZCZEPOWICE-1
Construction of high-pressure gas pipelines along with formation water pipelines as part of the development...
CONSTRUCTION OF GAS PIPELINE DN300/250 FROM SN KŁODAWA TO SN WITNICA
Construction of a 42 km high-pressure gas pipeline with MOP 6.3 MPa, diameter 250/300mm along with technological facilities...